
Add to Cart
premade pouch packing machine
horizontal pouch packing machine
film rolling packing
Shanghai Rutian Packaging Co., Ltd. has years of service experience in food, pharmaceutical, chemical, edible oil and other industries. And China's largest dairy company Yili, Nestle, and other food companies has chosen us. Our main service team has many years of working experience. Our company is one of the top five packaging companies in China. Our factory covers an area of 5000 square meters and has more than 80 employees. We have been engaged in researching and producing packing machines for many years
This granule packing machine is suitable for automatic packaging of liquid of foods,medicine and chemicals industry, such as shampoo,body foam bath lotion,facial cream,ingredient oil,fruit sauce,tomato ketchup and etc.
Specification:
Model | RT-180S | RT-210S | RT-260S | RT-330S |
Pouch Types | Flat bag, or with optional Hanging hole, Zipper, Spout | |||
Pouch Size (mm) | 70 (Min.) | 70(Min.) | 80 (Min.) | 85(Min.) |
180-225(Max.) | 210-320(Max.) | 240-350(Max.) | 320-450 (Max.) | |
Volume (Max.) | 400ml | 1000ml | 1500ml | 2000ml |
Speed (bpm) | 30-60 | 30-60 | 30-60 | 30-70 |
Power (kw) | 3.5 | 4.5 | 5.5 | 6.5 |
Weight (kg) | 1000 | 2000 | 2300 | 3000 |
Work Principle:
Bag Types:
Real Picture in the workshop
Packing EXPO
After-sales service
1.Installation
The initial installation is NOT included with the professional ROTY team member. All installation with the ROTY team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours.
2 .After Service
ROTY provide free parts and parts delivery, when manufacture defects has been detected during normal operation (vulnerable parts not included) under warranty period.
3.Training
We will provide free training to your technician free of charge at our factory site in Shanghai, China. The total training period would be 2 working days. All travel and related expensed would be at the purchaser’s expense.
International stardard wooden box for machine packing