
Add to Cart
10kg Rice Premade Pouch Doypack Bag Filling Packing Machine
Related products
Technical parameters:
Filling type | Double-screw filling |
| |
Packaging accuracy | |
Packaging speed | |
| 380/220V 50-60Hz(TN-S) |
Working power | |
Bag size |
|
| Kraft paper bag, woven bag (coated film), plastic bag (film thickness 0.2mm), woven bag (PE plastic bag), etc |
Bag type | Pillow shaped open pocket |
Gas consumption | 6kg/cm2 0.3cm3/min |
Real Picture in the workshop
Packing EXPO
International stardard wooden box packinage machine
The initial installation is NOT included with the professional ROTY team member. All installation with the ROTY team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours..